Intervention: consolidation by driving in 33 MP60 steel micropiles (CE-marked product according to European standard EN1090-1:2009).
Depth reached by the micropiles with respect to the foundation laying surface: from 7 to 9 meters.
Driving pressure: from 200bar to 240bar corresponding to 20 to 24 tons for each driven in micropile.
Duration of consolidation intervention: 5 days.
Number of operators employed for the work: 3 specialized operators.