Intervention: consolidation of 57 linear meters of foundation with the installation of 39 LIFT PILE® (pressure micropiles with adjustable preloading device) and subsequent injection of expanding resin to fill the void rceived from the lifting.
Quantity of resin used: about 530 kilograms of injected product
Lifting obtained from the intervention performed: from a minimum of 0.5 to a maximum of 2 centimeters
Average depth reached by the micropiles with respect to the paving surface: 13 meters
Average driving pressure: 220bar corresponding to 22 tons
Preloading pressure: 700Nm
Duration of the consolidation intervention: 11 days
Number of site operators: 3