Intervention: consolidation of 57 linear meters of foundation by injections of KERASTABLE® expanding polymers for 1-2 millimeters uplift and subsequent installation of 53 LIFT PILE® (pressure micropiles with preloading device)
Quantity of resin used: approx. 770 kilograms of injected product
Lifting achieved by the performed intervention: 1-2 millimeters
Average depth reached by the micropiles with respect to the pavement laying surface: 5 meters
Average driving pressure: 240bar corresponding to 24 tons
Duration of consolidation intervention: 7 days
Number of site operators: 3