Intervention: consolidation of foundation by laying 37 LIFT PILE® (pressure micropiles with preloading device) and performing 04 injections of KERASTABLE® expanding polymers on a depth level
Quantity of resin used: about 60 kilograms of injected product
Average depth reached by the micropiles in relation to the paving level: 6 meters
Average driving pressure: 220bar corresponding to 22 tons
Preloading pressure: 500Nm
Duration of consolidation work: 4 days
Number of site operators: 3