Industrial flooring to be made in Trieste

Consolidation by Track Pile Technology
Structure: industrial pavement to be constructed by the client following prior consolidation by driving in pressure micropiles using Track Pile technology
Foundations: planned to construct a new concrete pavement with electrowelded mesh
Disturbance: not found, required prior consolidation of a pavement to be constructed by the client
Soil: soils of low consistency to depths greater than 20 meters from the ground level.
Il Progetto

Intervention: consolidation by laying 143 pressure micropiles driven in by means of macchiary, Track Pile technology
Average depth reached by the micropiles in relation to the paving surface: 24 meters
Average driving pressure: 29 tons
Duration of consolidation intervention: 16 days
Number of site operators: 3