Intervention: consolidation of 33 linear meters of foundation and 01 plinth with the installation of 24 LIFT PILE® (pressure micropiles with preloading device).
Average depth reached by the micropiles with respect to the foundation laying surface: 9 meters
Average driving pressure: 220bar corresponding to 22 tons
Duration of consolidation intervention: 3.5 days
Number of site operators: 3