Intervention: consolidation and uplift of the structure (uplift on part of the structure 1-2 millimeters and on other portion 1-2 centimeters) mediate laying of 100 LIFT PILE® (pressure micropiles with preloading device) and subsequent execution of Kerastable® expanding polymer void-filling injections
Quantity of resin used: about 230 kilograms of injected product
Relief obtained from the performed intervention: from a minimum of 1-2 millimeters to a maximum of 2 centimeters in the most subsided part
Average depth reached by micropiles relative to the paving surface: 18 meters
Average infusion pressure: 220bar corresponding to 22 tons
Duration of consolidation intervention: 14 days
Number of site operators: 3