Intervention: consolidation by infixing 63 MP60 steel micropiles (Product CE marked according to the European standard EN1090-1:2009) and 9 Lift Pile® consolidation – MP60 steel micropiles (Product CE marked according to the European standard EN1090-1:2009) pre-tensioned (European patent no. 2918731) with special jackets for infixing on the new foundation to be built.
Depth reached by micropiles relative to the foundation laying surface: 24 to 27 meters.
Driving pressure: 220 and 230 bar corresponding to 22 and 23 tons per driven micropile.
Duration of consolidation intervention: 11 working days.
Number of operators employed for processing: 3 skilled operators.