Intervention: consolidation by driving in 33 MP60 steel micropiles (Product CE marked according to the European standard EN1090-1:2009).
Depth reached by the micropiles in relation to the foundation laying surface: from 16 to 20 meters.
Driving pressure: 200bar corresponding to 20 tons per driven in micropile.
Duration of the consolidation intervention: 2.5 days.
Number of operators used for the work: 3 specialized operators.