Intervention: consolidation of foundations by laying 38 MP60 steel micropiles (CE-marked product – EN 1090-1:2009)
Depth reached by the micropiles in relation to the foundation laying surface: from 15 to 17 meters.
Driving pressure: 230 bar corresponding to 23 tons per driven micropile.
Duration of consolidation intervention: 6 working days.
Number of operators used for the work: 3 specialized operators.