Intervention: consolidation by driving 222 MP60 steel micropiles (Product CE marked according to the European standard EN1090-1:2009)
Depth reached by the micropiles with respect to the foundation laying surface: from 8 to 12 meters.
The intervention required the use of trained personnel with special equipment for confined spaces, accessing the site area only by a 1m diameter valve.
Type of foundation: reinforced concrete slab.
Depth of foundation: 70 cm.
Average depth reached by the micropiles with respect to the intrados of the slab: 8-12 meters.
Average driving pressure: 230/240 bar corresponding to strengths greater than 220 kN per driven micropile.
Duration of consolidation work: 7 days.
Number of operators used for the work: 5 skilled operators.