Residential Condominium located in Duisburg – DE

Consolidation of the foundation and raising of the building. Securing the structure
Building type: basement garage of an apartment building.
Problem identified: Differential foundation failure with subsidence of the structure by 5 cm. Presence of numerous cracks due to structural failure, with structure declared with “imminent danger.”
Technologies used: LIFT PILE®, MP60 steel micropiles (Product CE marked according to European Standard EN1090-1:2009) pre-tensioned (European Patent nr.2918731B1 and execution of KERASTABLE® type HDR® high-density resin injections (Expanding Polymers) to fill the void created by the lifting obtained.
Il Progetto

Extent of intervention:
132 micropiles executed
Results obtained:
Lifting performed: Controlled lifting of 3.5 cm.
Stability achieved: lifting of the structure with partial closure of cracks, restoration of the structure to serviceability.
Time of execution: Total duration of twenty working days.
Customer benefits:
Rapid and minimally invasive intervention.
Any peculiarities:
Final solution of the subsidence problem, with restoration of the structure’s serviceability.
Practical example:
“Intervention in Duisburg on an apartment building garage subject to differential subsidence and presence of numerous cracks. Building declared with “imminent danger.” We performed foundation consolidation using LIFT PILE and a 3.5 cm controlled lift, allowing partial closure of the cracks. The intervention restored structural stability and secured the building, restoring the original market value of the building.