Residential Condominium located in Trapani (TP)

Foundation consolidation using Novatek micropiles and materials that are unresponsive to the chemical conditions of subsurface water
Problem identified: Differential subsidence of the building due to corrosion of existing foundation piles, due to the presence of brackish water and sulfates that led to the corrosion of the reinforced concrete works
Technologies used: injections of high-density KERASTABLE® type HDR® resins (Expanding Polymers) and subsequent installation of MP60 steel micropiles (Product CE marked according to the European standard EN1090-1:2009).
Il Progetto

Extent of intervention:
Entire complex (377 MP + 85 sq. m. resin injections)
Time of execution:
Total duration of 36 working days.
Any peculiarities:
MP60 Novatek performed with infusion for the first 6m of steel with anti-corrosive treatment and special protective mortars